Shutdown Activities

Shutdowns for scheduled maintenance, cleaning, and servicing measures are a critical time for any operator of an industrial facility. Each day of a plant shutdown translates to revenue loss. Ever more stringent legal regulations increase the requirements for industrial facilities, while the timeframes for these shutdowns are becoming increasingly shorter.

Precise, on-schedule, and reliable – shutdowns with J.Christof

Especially shutdowns of large industrial facilities require proper preparation, precise planning, and outstanding implementation in order to fulfill all the tasks in a timely manner. Every day counts – and nonetheless, it is necessary to ensure the highest quality, precise work, and compliance with safety standards. These are the core competencies of J.Christof.

We assist you both as a general contractor for the shutdown as well as with services. Due to our experience in turnarounds of large industrial facilities in different sectors, we ensure a smooth flow and timely implementation of your project.

Our Services

Planning and implementation

Shutdown management

Apparatus repairs

Pipeline repairs

Tank repairs

Electronic I&C systems and fittings service

Mechanical work

  • Heat exchangers
  • Reactors
  • Columns
  • Furnaces
  • Tanks

OUR PROJECTS SPEAK FOR THEMSELVES

Shutdown Activities at the Refinery in Pancevo LOT 2 (MHC/DHT)

Client: NIS-Gazprom Pancevo

The experienced and trusted specialists of J.Christof were deployed during the shutdown activities at the Gazprom refinery in Pancevo. Extensive mechanical tasks were performed on 215 plant components, such as heat exchangers, apparatuses, reactors, and columns in a very time-sensitive preparation and implementation phase. J.Christof deployed up to 290 specialists on site and was able to implement the project on schedule and to the fullest satisfaction of the customer.

Services:

  • Mechanical work in LOT 2
  • Column service
  • Reactor service
  • Boiler service
  • Heat exchanger service
  • Service on process furnaces
  • Coordination of various tasks (scaffolding, insulation, cleaning, brickwork, and hoisting devices)

Turnaround, Karlsruhe Refinery

Client: Mineralölraffinerie Oberrhein GmbH & Co. KG (MiRO)

For conducting inspection work at the MiRO refinery in Karlsruhe a scheduled shutdown of multiple relevant processing plants occurred. During this extensive shutdown, J.Christof undertook the mechanical tasks on columns, furnaces, heat exchangers, tanks, fittings, as well as district heating pipe systems. Although the schedule was very ambitious, J.Christof was able to implement the shutdown activities on schedule with the deployment of up to 700 specialists. Furthermore, J.Christof distinguished itself through efficient work performance and stringent safety standards. Not a single work accident was reported during this project involving approx. 400,000 installation hours.

 

Services:

  • Mechanical shutdown activities on columns, heat exchangers, air coolers, furnaces, tanks, and fittings
  • Disassembly of equipment and pipelines
  • Equipment installations, such as heat exchangers and tanks
  • Prefabrication and installation of pipelines

 